Zorastra supports Malaysian EPCs, installers and distributors with matched solar storage and solar water pump options, documentation coordination, sample-order support and export supply. Local partners remain responsible for site survey, permits, installation and service.
Each product route is matched to the application, destination requirements and local delivery responsibilities before final quotation.
For solar pumps, begin with water flow and head. For storage, begin with the inverter or load, voltage, destination country and expected order size.
Factories and commercial sites need load, tariff, PV, grid and local-service information before a storage direction can be responsibly discussed.
Zorastra coordinates equipment, documents and export supply. The local EPC or installer owns the site survey, permits, installation and end-user service.
Zorastra coordinates product matching, documents, export and spare parts. Local EPCs and installers confirm the site requirements, installation scope and end-user service arrangement.
Zorastra is a packaged equipment supply partner for local projects.
We support solution design, BOM selection, procurement, assembly coordination, export documents, spare parts and remote technical support. Local partners manage customer communication, permits, installation, grid connection, insurance and end-user service.
Every route is matched to a use case, destination requirements and the local partner's service scope before final quotation.
| Product route | How it should be qualified |
|---|---|
| Solar water pump project pack | Confirm required water flow, total head, water source, pipe size, operating hours and site environment before selecting a pump and PV configuration. |
| Home and small storage | Confirm inverter or load, battery voltage, destination country, AC voltage / plug where relevant, sample quantity and documentation expectation. |
| C&I storage project pre-check | Collect bills or load profile, peak demand, PV size, grid condition, installation space and a local EPC contact before discussing a preliminary capacity range. |
| Documentation and spare-parts coordination | Confirm exact model applicability, packing, warranty boundary, available documents and the local partner's commissioning and service responsibilities. |
We support the companies that can assess the site, manage installation and provide local service, as well as end users working with an appointed local partner.
Need supply, margin, technical files and fast quotations for commercial rooftop and storage add-ons.
Already serve factories and buildings; best channel for backup, switchgear, meters and BESS integration.
Need power continuity, energy-cost control and a payback story that does not depend on speculative subsidies.
Need backup for refrigeration and clear service response, making them good early adopters.
Need pump power, diesel reduction and rugged serviceable systems for remote loads.
Need narrow, repeatable product tiers and exclusive territory logic before they invest in sales effort.
Clear responsibility boundaries help local partners quote, install and support projects with confidence.
We confirm product documents against the exact model and destination requirement before quotation. Local compliance is confirmed with the appointed EPC and relevant authority.
Qualified projects receive a clear product configuration, document list, packing plan, warranty boundary and spare-parts route.
Storage projects are reviewed around self-consumption, peak demand, backup needs and site conditions. Final project economics require actual load and tariff data.
The local partner handles site visits, installation and replacement labour. Zorastra coordinates remote product support, parts and warranty decision support.
Answers are intentionally conservative and written for B2B partner discussions, not consumer over-promising.
Zorastra coordinates product matching, documentation, export and spare parts. The appointed local EPC or electrical contractor confirms site survey, permits, installation and local service scope.
Zorastra coordinates product matching, documents, export and spare parts. The appointed local EPC or electrical contractor manages the site survey, permits, installation, commissioning and after-sales labour.
For solar pumps, provide water flow, total head, water source and operating hours. For storage, provide the inverter or load, voltage, destination country, expected quantity and documentation needs. C&I projects also require site, load, PV and local EPC information.
Confirm Energy Commission requirements, SIRIM/CoA route where applicable, SEDA programme status, TNB or utility interconnection, fire and building requirements, local licensing and installer qualifications.
After the product fit, documents, installation scope, spare-parts plan and service responsibility are confirmed, Zorastra can prepare a matched sample or pilot-order proposal.
These notes were checked on 2026-07-11. Programme availability, tariff, certification and grid-connection details change over time and must be checked with the local EPC and relevant authority before quotation or installation.
The NEM 3.0 reference material describes prior programme routes and states a 2025 allocation period. Check the current programme and application route before using it in a project calculation.
SourceMalaysia's Energy Commission covers electricity regulation, safety, pricing, sustainability and market access topics.
SourceMalaysia's energy transition ministry leads national energy transition and electricity policy direction.
SourceTNB is the main Peninsular Malaysia utility and a key reference for local interconnection, tariffs and customer electricity context.
SourceSend the target customer type, expected quantity, voltage/grid requirements and service boundary. We will prepare a matched product pack, documentation list and export quotation.